Time dependent factors in pile quality and capacity control

Jaroslaw Rybak

Abstract


This work presents the results of field testing and further analysis of length estimation and capacity of piles. Concerning the CFA pile quality control, the measured elastic wave velocities examined between the 5th and 15th day after the C20/25 concrete embedding ranged from 3,000-4,000 m/s. However, the standard deviation is relatively high, the time seems to be the crucial factor. Load tests (capacity tests) as well as the tests of the length and integrity of the foundation piles belong to the set of indispensable control procedures, which verify the design and the execution of pile foundations. Bearing in mind the applied piling technology and the soil conditions, it is necessary to define the minimal time span between the piling and the beginning of the tests. At the same time, the pressure from the contractors often causes the control procedures to begin and finish before that time. The research conducted at Wroclaw University of Technology shows that in the case of driven piles, the increase of capacity can be observed mainly in cohesive soils, where the reconsolidation of soil around the pile affects strongly the pile-soil shaft adhesion.

Keywords:

integrity test (PIT), CFA pile, static load test (SLT), driven pile

Full Text:

PDF

References


ASTM D5882-07. Standard Test Method for Low Strain Impact Integrity Testing of Deep Foundations.

ACI 228.1 R-03. In-Place Methods to Estimate Concrete Strength (ACI Committee 228).

ACI 228.2 R-98. Nondestructive Test Methods for Evaluation of Concrete in Structures(ACI Committee 228).

Amir, J.M., 1988. Wave velocity in young concrete. Proc 3rd Intl Conf on Application of Stress-wave Theory to Piles. Ottawa, pp. 911-912.

Finno, R.J.; Gassman, S.L., 1998. Impulse response evaluation of drilled shafts. Journal of Geotechnical and Geoenvironmental Engineering, 124(10), pp. 965–975.

http://dx.doi.org/10.1061/(ASCE)1090-0241(1998)124:10(965)

Gorska, K.; Rybak, J., 2011. Badania prędkości fali akustycznej w betonie pali CFA. Górnictwo i Geoinżynieria. 35(2), pp. 251-256. (in Polish).

Hoła, J.; Schabowicz, K.; 2010. State-of-the-art non-destructive methods for diagnostic testing of building structures - anticipated development trends. Archives of Civil and Mechanical Engineering, 10(3), pp. 5-18. http://dx.doi.org/10.1016/S1644-9665(12)60133-2

Jardine, R. J.; Standing, J.R.; Chow, F.C., 2006. Some observations of the effect of time on the capacity of piles driven in sand. Géotechnique, 56(4), pp.

König, F.; Grabe, J., 2006. Time dependant increase of the bearing capacity of displacement piles. Piling and Deep Foundations. Conference Proceedings, DFI EFFC, Amsterdam, pp. 709-717.

Niederleithinger, E.; Taffe, A., 2006. Early stage elastic wave velocity of concrete piles. Cement & Concrete Composites, 28, pp. 317–320. http://dx.doi.org/10.1016/j.cemconcomp.2006.02.013

Rybak, J., 2008. Influence of the time after construction on static load testing of pre-cast driven piles. Studia Geotechnica et Mechanica, 30, pp. 181-188.

Rybak, J.; Sobala, D.; Tkaczynski, G., 2008. A case study of piling project and testing in Poland. Proc. of the 8th international conference. The application of stress-wave theory to piles: science, technology and practice. Lisbon, Portugal, 8-10 September 2008. ed. by Jaime Alberto dos Santos. Amsterdam : IOS Press, cop. pp. 175-178.

Rybak, J.; Schabowicz, K., 2011. Acoustic wave velocity tests in newly constructed concrete piles. E-Journal of Nondestructive Testing & Ultrasonics, 16(4), pp. 247-254.

Schabowicz, K., 2010. Empirical relations for non-destructively determined strength of concrete on different days of its maturing. NDE for Safety, November 10-12, 2010, Pilsen, Czech Republic, ed. by Pavel Mazal and Luboš Pazdera. Brno : University of Technology. Faculty of Mechanical Engineering.

Skov, R.; Denver, H., 1988. Time dependence of bearing capacity of piles. Proc. Third International Conference on the Application of Stress-Wave Theory to Piles. Ottawa, 25-27 May, pp. 879-888.

Svinkin, M.R.; Skov, R., 2005. Set-up effect of cohesive soils in pile capacity. Available at: http://www.vulcanhammer.net/svinkin/set.php

Thasnanipan, N.; Maung, A.W.; Navaneethan, T.; Aye, Z. Z., 2000. Non-destructive integrity testing on piles founded in Bangkok subsoil. In: Proceedings of 6th Conference on the application of stress wave theory to Piles, Sao Paulo, Brazil, Balkema, Rotterdam.




DOI: 10.7250/iscconstrs.2014.24

Refbacks

  • There are currently no refbacks.