Multi-Attribute Decision-Making Methods for Assessment of Quality in Bridges and Road Construction: State-of-the -Art Surveys

Edmundas Kazimieras Zavadskas, Roode Liias, Zenonas Turskis

Abstract


Multi-attribute analysis is a popular tool in many economical, managerial, constructional etc. problems. This document provides a review of international and national practices in investment decision support tools in bridges and road quality management. Cost benefit analysis and multi-attribute analysis are principal methodologies in supporting decision-making in bridges and road quality management. The complexity of the applications shows significant differences in international practices. There are continuing discussions amongst practitioners and researchers, regarding to which one is more appropriate in supporting decision-making. It is suggested that more than one approach should be regarded as complementary instead of competitive means. Multi-attribute analysis may be particularly helpful in early stages of project development, strategic planning. Cost benefit analysis is used most widely for project prioritization and selecting the final project from a set of alternatives. These methodologies are applicable to the problems with large numbers of scenarios and attributes. The research has concluded that multi-attribute decision-making methods are very useful for bridge and road construction.


Keywords:

bridge; road; design; construction; alternative; quality; multi-attribute; assessment; decision-making

Full Text:

PDF

References


Antuchevičienė, J.; Turskis, Z.; Zavadskas, E. K. 2006. Modelling renewal of construction objects applying methods of the game theory, Technological and Economic Development of Economy 12(4): 263–268.

Bardauskienė, D. 2007. The expert‘s estimates application in the preparation of city general plan, Technological and Economic Development of Economy 13(3): 223–236.

Butkevičius, S.; Petkevičius, K.; Kamaitis, I. Z. 2007. Evaluation of flexible road pavement construction state using objective strength criteria, The Baltic Journal of Road and Bridge Engineering 2(2): 61–66.

Čygas, D.; Laurinavičius, A.; Vaitkus, A.; Perveneckas, Z.; Motiejūnas, A. 2008. Research of asphalt pavement structures on Lithuanian roads (I), The Baltic Journal of Road and Bridge Engineering 3(2): 77–83.

Ekrias, A.; Eloholma, M.; Halonen, L.; Song, X.-J.; Zhang, X.; Wen, Y. 2008. Road lighting and headlights: luminance measurements and automobile lighting simulations, Building and Environment 43(4): 530–536.

Frangopol, D.; Liu, M. 2007. Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost, Structure & Infrastructure Engineering 3(1): 29–41(13).

Gerbrandt, R.; Berthelot, C. 2007. Life-cycle economic evaluation of alternative road construction methods on low-volume roads, Transportation Research Record 1989: 61–71.

Hwang, C. L.; Yoon, K. 1981. Multiple attribute decision making: methods and applications; a state-of-the-art survey. 1st edition. Berlin: Springer. 259 p. ISBN 3540105581

Jakimavičius, M.; Mačerinskienė, A. 2006. A GIS-based modelling of vehicles rational routes, Journal of Civil Engineering and Management 12(4): 303–309.

Kaklauskas, A.; Zavadskas, E. K.; Raslanas, S.; Ginevičius, R.; Komka, A.; Malinauskas, P. 2006. Selection of low-e windows in retrofit of public buildings by applying multiple criteria method COPRAS: a Lithuanian case, Energy and Buildings 38(5): 454–462.

Kaklauskas, A.; Zavadskas, E. K.; Banaitis, A.; Šatkauskas, G. 2007. Defining the utility and market value of real estate a multiple criteria approach, International Journal of Strategic Property Management 11(2): 107–120.

Kamaitis, Z. 2007a. Structural design of polymer protective coatings for reinforced concrete structures. Part 1: theoretical consideration, Journal of Civil Engineering and Management 13(1): 11–17.

Kamaitis, Z. 2007b. Structural design of polymer protective coatings for reinforced concrete structures. Part II: experimental verification, Journal of Civil Engineering and Management 13(1): 19–26.

Kapliński, O.; Janusz, L. 2006. Three phases of multifactor modelling of construction processes, Journal of Civil Engineering and Management 12(2): 127–134.

Marzouk, M.; Zein El-Dein, H.; El-Said, M. 2007. Application of computer simulation to construction of incremental launching bridges, Journal of Civil Engineering and Management 13(1): 27–36.

Miyamoto, A.; Konno, M.; Nakamura, H.; Bruhwiler, E. 2006. Maintenance plan optimization system for existing concrete bridge groups, Structure and Infrastructure Engineering 2(2): 91–115.

Peldschus, F.; Zavadskas, E. K. 2005. Fuzzy matrix games multicriteria model for decision-making in engineering, Informatica 16(1): 107–120.

Petkevičius, K.; Sivilevičius, H. 2008. Necessary measures for ensuring the quality of hot mix asphalt in Lithuania, The Baltic Journal of Road and Bridge Engineering 3(1): 29–37.

Roy, B. 1991. The outranking approach and the foundations of ELECTRE methods, Theory and Decision 31: 49–73.

Saaty, T. L. 1980. The analytic hierarchy process: planning, priority setting, resource allocation, McGraw-Hill, Tx. 287 p. ISBN 0070543712.

Su, Ch.-W.; Cheng, M.-Y.; Lin, F.-B. 2006. Simulation-enhanced approach for ranking major transport projects, Journal of Civil Engineering and Management 12(4): 285–291.

Turskis, Z.; 2008. Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique, Technological and Economic Development of Economy 14(2): 224–239.

Turskis, Z.; Zavadskas, E. K; Zagorskas, J. 2006. Sustainable city compactness evaluation on the basis of GIS and Bayes rule, International Journal of Strategic Property Management 10(3): 185–207.

Ugwu, O. O.; Kumaraswamy, M. M.; Wong, A.; Ng, S. T. 2006a. Sustainability appraisal in infrastructure projects (SUSAIP). Part 1: development of indicators and computational methods, Automation in Construction 15(2): 239–51.

Ugwu, O. O.; Kumaraswamy, M. M.; Wong, A.; Ng, S. T. 2006b. Sustainability appraisal in infrastructure projects (SUSAIP). Part 2: a case study in bridge design, Automation in Construction 15(2): 229–238.

Ustinovičius, L.; Zavadskas, E. K.; Podvezko, V. 2007. Application of a quantitative multiple criteria decision making (MCDM- 1) approach to the analysis of investments in construction, Control and Cybernetics 36(1): 251–268.

Vaidogas, E. R. 2007. Risk oriented design of protective highway structures, The Baltic Journal of Road and Bridge Engineering 2(4): 155–163.

Viteikienė, M.; Zavadskas, E. K. 2007. Evaluating the sustainability of Vilnius city residential areas, Journal of Civil Engineering and Management 13(2): 149–155.

Wang, Y. M; Elhag, T. M. S. 2006. Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment, Expert Systems with Applications 31(2): 309–319.

Witzany, J.; Zigler, R. 2007. The analysis of non-stress effects on historical stone bridge structures (monitoring, theoretical analysis, maintenance), Journal of Civil Engineering and Management 13(2): 157–167.

Zavadskas, E. K.; Antuchevičienė, J. 2006. Development of an indicator model and ranking of sustainable revitalization alternatives of derelict property: a Lithuanian case study, Sustainable Development 14: 287–299.

Zavadskas, E. K.; Antuchevičienė, J. 2007. Multiple criteria evaluation of rural building’s regeneration alternatives, Building and Environment 42(1): 436–451.

Zavadskas, E. K.; Turskis, Z. 2008. A new logarithmic normalization method in Games theory, Informatica 19(2): 303–314.

Zavadskas, E. K.; Zakarevičius, A.; Antuchevičienė, J. 2006. Evaluation of ranking accuracy in multi-criteria decisions, Informatica 17(4): 601–618.

Zavadskas, E. K., Kaklauskas, A.; Peldschus, F.; Turskis, Z. 2007. Multi-attribute assessment of road design solutions by using the COPRAS method, The Baltic Journal of Road and Bridge Engineering 2(4): 195–203.

Zavadskas, E. K.; Kaklauskas, A.; Turskis, Z.; Tamošaitienė, J. 2008. Selection of the effective dwelling house walls by applying attributes values determined at intervals, Journal of Civil Engineering and Management 14(2): 85–93.

Ziari, H.; Khabiri, M. M. 2007. Interface condition influence on prediction of flexible pavement life, Journal of Civil Engineering and Management 13(1): 71–76.

Žilionienė, D.; Čygas, D.; Juzėnas, A. A.; Jurgaitis, A. 2007. Improvement of functional designation of low-volume roads by dust abatement in Lithuania, Transportation Research Record 1989: 293–298.

Žilionienė, D.; Laurinavičius, A. 2007. De-icing experience in Lithuania, The Baltic Journal of Road and Bridge Engineering 2(2): 73–79.

Завадскас, Э. К. 1991. Системотехническая оценка технологических решений строительного производства [Zavadskas, E. K. Systems of estimation of technological solutions in building construction]. Ленинград: Стройиздат. 256 с. ISBN 5274011691.

Леонович, И.; Кашевская, Е. 2007. Выбор критериев мониторинга процессов на оперативном уровне управления качеством автомобильныx дорог [Leonovich, I.; Kashevskaja, E. Selection of criteria for process monitoring at the operative level of road quality management], Technological and Economic Development of Economy 13(2): 144–152.




DOI: 10.3846/1822-427X.2008.3.152-160

Refbacks

  • There are currently no refbacks.


Copyright (c) 2008 Vilnius Gediminas Technical University (VGTU) Press Technika